Dulwich & Sydenham Hill Golf Club

  • Date of implementation: 16-18.04.2018
  • Subcontractor Arcus Landscaping Ltd – from start to finish
  • Bunker renovation by hole no 7
  • Stripped turf and topsoil around bunker
  • Reshaped bunker and added new – drainage attached to outlet
  • Added Mot type 1 compacted material – laid recycled rubber over bunker
  • Added revetted turf and back-filled – with topsoil in preparation for turf

Parkstone Golf Club

  • Date of implementation 21.02.2018
  • Subcontractor Arcus Landscaping Ltd
  • laid rubber path behind hole no 7

Project Manager For Private Client

  • Date of implementation 05-19.01.2012
  • Pond reconstruction
  • Pumped old water
  • Reshaped pond by adding two tier levels
  • Laid geotextile fabric beneath liner
  • Shaped surrounding area in preparation for cascade feature using the same method to include aggregates
  • Installed pipe from the pump to deliver water to the cascade to creative movement and visual and sound effects, using a flotation buoy to secure the pump down

West Herts Golf Club

  • Date of implementation: 22.09-13.10.2017
  • Subcontractor Arcus Landscaping Ltd – from start to finish
  • Renovated bunker by green no 3
  • Created bunker and mounds
  • Stripped turf and topsoil
  • Shaped bunker, and added new – drainage attached to outlet
  • Added Mot type 1 compacted material
  • Aid recycled rubber over bunker
  • Added revetted turf and back-filled – with topsoil in preparation for tu
  • Enhanced existing swales and used fescue and-a-arena turf to create texture and heigh

CAMBERLEY HEATH GOLF CLUB

  • Date of implementation various dates 2017 and 2018
  • Subcontractor Arcus Landscaping Ltd
  • laid rubber onto existing bunkers
  • positioned heathers behind green and by the rough

CHESSINGTON GOLF CENTER

  • Date commenced: 24.04-13.08.2007
  • Project manager
  • To extend and level existing driving range
  • Construction of two greens, tees, bunkers and develop new pond

Hankley Common Golf Club

  • Date of implementation: 07.10.-05.11.2013
  • Project manager
  • Reshaped revetting faces, contouring the bunkers,installation of new drainage and soakaways
  • Back-filling new sand

Hankley Common Golf Club

  • Date commenced: 31.01.-02.02.2018
  • Subcontractor Arcus Landscaping Ltd
  • Filling with root zone between heathers and green
  • Positioning of heathers

MOOR PARK GOLF CLUB

  • Date commenced: Various date from October 2017 – May 2018
  • Subcontractor Arcus Landscaping Ltd
  • Back filling topsoil and finalizing for re-turfing
  • Installing drainage for practice green
  • Enhancing existing mounds
  • Installation of rubber and revetting on several bunkers.

SUTTON GREEN GOLF CLUB

  • Date commenced: Various dates from 2007 – 2015
  • Project manager
  • Reconstructed hole 9
  • Reconstruction of entire practice area
  • Installing three practice greens, tees and bunker
  • Affixed a pond to an existing water feature by installing a pump to the current feature using a cascading effect

THORNEY PARK GOLF CLUB

  • Date commenced: Various dates from 2007-2016
  • Project manager
  • Reshaped tee on driving range
  • Reconstructed several bunkers adding mounds to surrounding area
  • Reconstruction of tee 5
  • Rebuilt several tees and mounds

PRIVATE CLIENT ON WENTWORTH GOLF COURSE

  • Date commenced: Various dates from 2008-2015
  • Project manager
  • Construction of a private 9 hole course from beginning to end
  • Adding several ponds